AA MAST Systems Engineering II, SeaPerch ROV
Wednesday, January 22, 2014
AA Construction
Parts one and two assembled (Ballast)
All parts shown above
Parts one and two non-assembled
Two of the necessary hose clamps
Parts three and seven
Part 8 show above
PVC joints
PVC elbows
Part 6 cut and drilled
Full assembly
base formed
ends of base beginning to form
side mounts
ballast supports
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment